Sheetrock

We passed our inspections with flying colors! Now, on to the next step.



After installing the insulation, it was time for the first drywall layer. We chose to hang the first layer horizonally.

Here are my guys. Jim, Nick and Jason.


All the seams were caulked with SoundSeal acoustical caulk. It really is cheaper to buy this stuff instead of tubes and tubes of silicon caulk. I just wish it were a different color.

The second layer was hung vertically.

Two full tubes of Green Glue were applied to the back of each sheet as it went up.



Sounds strange, but now we wait for the drywall inspection.