Sheetrock
We passed our inspections with flying colors! Now, on to the next step.
|
| | After installing the insulation, it was time for the first drywall layer. We chose to hang the first layer horizonally.
Here are my guys. Jim, Nick and Jason.
|
---|
| | All the seams were caulked with SoundSeal acoustical caulk. It really is cheaper to buy this stuff instead of tubes and tubes of silicon caulk. I just wish it were a different color.
|
|
---|
|
| The second layer was hung vertically.
|
---|
| Two full tubes of Green Glue were applied to the back of each sheet as it went up.
|
|
---|
Sounds strange, but now we wait for the drywall inspection.